Back to the Sun Belt Newsfeed

Long Leads Surging UL Lafayette into Rivalry Showdown vs. UL Monroe

Sun Belt Conference Weekly News and Notes (Week 12)
2015-16 Sun Belt Conference Composite Schedule
2015-16 Sun Belt Conference Standings
2015-16 Sun Belt Conference Media Guide

Long Leads Surging UL Lafayette into Rivalry Showdown vs. UL Monroe
NEW ORLEANS– UL Lafayette rides a six-game winning streak into a rivalry game against UL Monroe, winner of its last four games, on Tuesday night at the Cajundome in Lafayette, La. The meeting of two teams in the top four of the men's basketball standings will be a rematch of the Louisiana rivals after the Warhawks won a 81-70 game in Monroe, La.