The Golden 1 Center is now more than a year into its construction process and with each passing day, a new feature of the downtown arena pops up. These days, the roof trusses and the exterior façade metal panel and glazing at the south side of the practice facility are the new noticeably visible features on the exterior of the building.
This video we shot Wednesday shows how the arena is shaping up. At the 7-second mark you will see what's left of the Downtown Plaza bridge after it was gutted. At the 25-second mark is the main entrance of the arena where the five-story, glass hangar doors will be.