RESULTS Tayshaun Cooper finished second in the 60m dash with a time of 6.88 and Ben Daumueller was third in the 600m with a time of 1:13.
AMES, Iowa – UNI Track and Field concluded a successful weekend at the elite Iowa State Classic at the Leid Rec Center in Ames with 45 top eight finishes and wins by Maddie McCalla in the 400m and Evan Long in the 200m. The men's 4x400-meter relay team took second by less than a 100th of a second to Minnesota but improved its MVC best time in the process.
McCalla, Long Lead UNI Track at ISU Classic