Back to the Kentucky Wildcats Newsfeed

A Progress Report on UK Football’s New Practice Facility

After spending the morning inside Nutter Fieldhouse for Pro Day, I checked out the progress on the new Kentucky Football Training Facility located next door. Projected to open later this summer before fall camp, most of the infrastructure is in place. Below is a view similar to the one above, featuring large walls of limestone and glass to connect the center to the Nutter Fieldhouse.

IMG_0329
The practice fields have multiple film towers, surrounded by limestone and wrought-iron fencing. As you can tell, the fields are still far from being usable.
IMG_0327
A closer look at the south side of the facility that will face the practice fields.