1. Kent State led for 58 minutes Saturday.
2. They took the lead 10 seconds into the game when Woody Barrett found Isaiah McKoy on a 75-yard touchdown heave. Over the next almost-hour of game-time, the Flashes added on another Barrett touchdown pass and four field-goals by freshman Matthew Trickett.
3. But in the end, it wasn’t enough.
4. Nathan Rourke spun into the end zone with 1:28 left in the fourth quarter to give Ohio their first lead of the afternoon. Five plays later, Barrett was intercepted by Ohio’s Javon Hagan, and the Flashes walked off the field 1-5, dreaming of what could have been.