Back to the Florida State Seminoles Newsfeed

Noles News: Drone footage shows updated look at Doak Campbell Stadium, football facility construction

Related Topics: Florida State Seminoles

Our deep dive into everything you need to know about Florida State football’s 2025 recruiting class continues with a breakdown of the defensive names to get familiar with:

NoleThruandThru has been diving into all aspects of #Tribe25 this summer:

Football

We’re now roughly five months into the renovation project at Doak Campbell Stadium, as well as the construction of Florida State’s football-only facility — here’s a look at how things currently look, with some footage provided by Sunflower AeroCine exclusively to Tomahawk Nation:

Doak Campbell Stadium to feature limited seating in the 2024 season ahead of the anticipated 2025 finish date — the entire west side will be under construction during the 2024 season and all-season tickets will be impacted, with west sideline capacity to be reduced to about 7,000 seats due to construction.