I was fortunate enough to attend the new suites reveal, and took the opportunity to blaspheme.
I meant for this article to highlight all of the ongoing campus construction projects underway, but all we care about this time of year is football. Death Valley looks different now than it did last fall, and I saw it up close Friday evening at the suites reveal. As usual, the structure and bleachers were all pressure washed, the upper deck lettering got a fresh coat of paint, and the stadium as a whole looks better than ever.
However, you can tell from my photos plenty of last minute construction remains before opening weekend; both President Clements and AD Dan Radakovich assured the gathered donors that everything would be ready September 5th.