Back to the Chicago Cubs Newsfeed

Wrigley Field construction update: December 1

BCB’s David Sameshima visited Wrigley Field on a rainy Saturday afternoon and sent me this report:

I visited the ballpark midday. Earlier in the morning, some rather heavy rainstorms passed through the area. The rain had stopped when I arrived, but a light rain started to fall.

There was little construction activity visible from the street, but there was work still taking place inside. It was been a while since my last visit (November 3), so some of the things I noticed may have been covered in previous construction reports.

The Taco Bell was still open, as of Saturday, December 1.